Monday, December 7, 2009
Tuesday, November 24, 2009
Longest Number Ever Recorded
2010 will be the year for me back in Grenoble ... For now I do not really know when or for what to do but taste of the installation, Marie and I will arrange a family in St Ismier Eve, as a housewarming party with them.
The information is available at: http://2010reveillon.blogspot.com
Thursday, October 22, 2009
Gay Cruising Spots Lubbock,tx
Sunday, October 18, 2009
Oem Oil Filter For Is300
Having taken a little better 3DVIA Shape tool in hand, I could remake the model of the house more closely. Better able to realize the changes, I first tried to make a model of the existing house
The decor / furniture is made briefly, just to give a scale and apreçu functions of the parts. The first floor and the attic is not too messed up, I gave them to appear on the model easier to navigate.
The current proposal is basically the architect to meet the 3 pieces of life into a single space performing the functions of kitchen / living room / lounge. The laundry area is optimized and the old fireplace in the lounge ordered destroyed to create storage space in the kitchen and laundry. Outside, the gate is closed: a new opening in the wall is made across the field. The cars are parked now taken on a square on the area of front garden. The current location of car traffic is thus freed to create a new living space (Oven Pizza: D)
For the moment nothing is fixed, all this may well sure change, especially when the first budget estimates will be made: (
Tuesday, October 13, 2009
Cute Outfits For Chambelanes
The architect gave us 15 days ago, a first proposal for the plans of the house in Saint Ismier. The big changes is planned for the ground floor.
You can try you figure out how it can make, I made a small 3D model planes on the ground floor:
To see the 3D model you need to install the 3DVIA player available here .
The 3D model is currently quite crude, I hope to have the opportunity to flesh out more As the project progresses.
And for those who want to quickly draw their home, they may try applying themselves 3DVIA Shape . Finally
for people like me do not want to use Windows, here's a tutorial to rotate Chtit 3DVIA Shape on linux.
Saturday, September 26, 2009
Magneta Patti Beanie Baby
Here is a trick that made me laugh at the time:
http://www.ina.fr/art-et-culture/gastronomie/video/CPC07000767/special-cuisine-avec-les Recipe-of-the-rabbit-Jocelyn-a-la-prussienne.fr.html
1982 starts to far: (
Monday, September 21, 2009
A Nice Mesage To Put In A Baby Card
Friday, September 11, 2009
Akiba Online Mother 2010
Monday, August 24, 2009
Sunday, August 23, 2009
What Is A Decent Affordable Digital Slr Camera
In 1999, with Mael and Christopher, two buddies from high school, we had a poor wretched rap, but I re-listened to recently: I howled with laughter!
Here is the registration period: Culture is pure
[Julien]
Praise Mael freestyle rap!
[Christophe]
On the ground, going on the ground, knock! Grab your bat, clap!
[Mael]
Yesterday morning I walked into the grand
street when suddenly a man appeared to me then
He stared at me like as if I was naked while
in fact I was wearing my street culture
[All: Chorus]
Culture is pure
yeah sure!
Respect Our style
Our Way of Life
[Christophe]
Just look the state of our society
I have a few adjectives to describe it
dilapidated, Pete, cybernetized, uh ... decorated!
All that it annoys me I want to yell
Chorus
[Julien]
Yeah you get it for me rap is a true passion, it is the only
(your mother) response to
all our solutions is better than electronics (Your mother) and television
tuna z'ont to undergo the ultimate liposuction
Chorus
Saturday, August 1, 2009
How To Tell A Fake Steeptech
Last weekend I was fortunate to be invited to help @ buzeeg to join her parents in the heart of the Monts du Lyonnais, in the town of Larajasse for professionals who know.
Sunday, July 19, 2009
My Mom Got It With A Belt From Dad
From Splash Bomb |
From Splash Bomb |
In action, filmed and narrated by Mary, here is the performance of athletes (we play to that splashes the above, of course ...):
Thursday, July 16, 2009
Funny Friendship Letter To Friend
16/07 securing the terrace, restoration of furniture (sanding) and cleaning
17.07 cartons and removing furniture Chatenay
7.18 Moving
19/07 end of the adventure ...
remains to be done in the coming days:
raises threshold strip laundry,
In September, delivery
work plan, and the table
raises the credence of the kitchen
Wednesday, July 8, 2009
Identifying Stray Puppies
09 / 07 Securing the balcony of the office, asks threshold strip chambers
7.10 shipping work plans and re-delivery of the furnaces, ceiling plaster
7.11 poses worktops, cleaning closets
7.12 installation appliances, electricity from the utility room ceiling and painting
13/07 14/07
beam moving coil, cleaning the bathroom,
7.15 installation of electrical outlets in the kitchen
Sunday, June 28, 2009
How To Get 360 Joypad To Work With Vba
nothing! 3.7
cleaning, disposal rooms and office for installation of carpet, paint the fence for the terrace room cleaning
04/07, delivery 05/07
carpets cleaning the office, kitchen and office electricity finalization
06 / 07 laying carpet in bedrooms and office facility
7.7 adeline's house on the terrace
8.7 preparation for laying the backsplash, ceiling beam and crack repair
Saturday, June 20, 2009
Best Way To Pour Batter Into Cupcake
25.6 Verification hot water tanks, change digital code, sanding of the deck baluster, sanding baseboards rooms
6.26 sanding of the deck baluster
nothing
28/06 27/06 29/06
not paint the first layer balustrade of the terrace and rooms, paint rooms baseboards 6.30
painting cupboards, hallway walls and rooms, passage of the expert to seal the walls of the terrace. 1.7
floor sanding sealer and 2nd layer
Molecular Geometry Essay Questions
6.18 restoration parquet floor sanding and sanding after
19/06 20/06 prosecutor
nothing (Paris Air Show) 21/06
choice of wall and ceiling kitchen and office repair
22/06 prosecutors, Vitrification and the first layer AR emergencies, but the vital prognosis is not engaged!
23/06 24/06
nothing poses axis motorized blinds of 3 bedrooms, finished closet
Saturday, June 13, 2009
Can You Buy Kobe Beef In Canada
No news since February ... Good news: D
I will not take the excuse of work, it was much cooler than in the first half.
I could go out every Wednesday night with Xchange. Xchange Erasmus is the association. Each week they organize a party with free admission (with map Erasmus and / or student) and drinks at reduced prices. Usually a pub or club DEFOIS both if the bar does not club.
Getting back to school.
Monday of the recovery I wonder quietly (with 15 minutes in advance !!!!) current Business Plan. The teacher never came. We later learned that the course would not occur, the teacher being abroad and no replacement has been found.
For the course of Entrepreneurship & Emerging Economies, I went to the first two courses. It should be about every two weeks. The contents could be interesting, but the project was to create a game for train companies to multi-culture and so on. I did not pursue this course.
So I ultimately
Monday from 9am to 13pm: Virtual Reality (4 credits)
Tuesday from 9am to 12pm: Early detection of Technological Innovation potential (4 credits)
Wednesday from 9 am to 12 pm: High-tech Marketing ( 4 credits)
Thursday from 16h to 19h: Entrepreneurship (4 credits)
And especially my semester project at VRLAB (Virtual Reality Lab) (12 credits)
largment I spent more time than expected in the laboratory. But the atmosphere was really nice and I got to the end of the project.
level course in Virtual Reality, I have made a 3D billiards game, with half of my grade.
For the course of Electronics Marketing, no consideration. It falait make a marketing plan for a product that we chose a group of 4, participate in class and write a paper 3 to 6 pages on the key points we learned during the course.
My last class on entrepreneurship course is a story unto itself (the course is open to people from HEC Lausanne). The course was to present a business plan for a startup in the Hi-tech.
At the second course, we had to come up with an idea in mind businnes. The groups were "randomly" (some people have lied about their HEC curriculum, they are actually spent for engineers to be more friends HEC).
So I came down with 4 other people. A German Erasmus at EPFL is an engineering supply chain between raw and science. Two Swiss and Mexican HEC HEC.
I give here a very personal opinion but that will count much later in my career path. I honestly think that people who were with me and from HEC lack a technical basis. A simple example of reflection on the idea of business.
The proposal of the two Swiss HEC was to make a syrup dispenser (and water). They had possibly reflecting intelligently, they would drink water with syrup to beverage dispenser next to the Coke Zero and red bull. So why not a machine to dispense the syrup and water. And why not put the syrup and water in an aluminum canister and put it directly next to the other drinks ... cost of machine development and manufacturing cost of deployment = 0 = 0 etc.. (Idea stolen from another guy HEC by the way). Another idea to a company which sends the ashes of loved ones in space. (A pity it is already ...).
For cons the lady was quick-witted. She said she was still struggling with high heels when she must move quickly (run after the subway etc.).. It therefore proposed to design shoes with retractable heels. After a quick search, I started to saw that the company already offered and that it could be difficult to have a shoe rigid enough to withstand the high position while being comfortable without heel.
I will not talk over the idea developed, it has little importance.
I'll add that it is not necessarily easy to make the link between the technical people (engineers) and marketing both in the working method that level communication (replies to emails after 40 retries etc. for certain. ). In parallel
in this course, we had to "play" in an online simulation to create startup and write a report. It was damn good as simulation. There was no discussion and more. I had 5.5 to matter.
Finally I have two things to be accomplished during this semester. The presentation of my semester project to those of the laboratory (20 minutes) and review virtual reality (the course given by the director of my lab).
Let's talk about what I'll do next, the master thesis (CTB in France).
EPFL offers students a database of courses. You can register for 3 proposals per round. There were 3 rounds. The problem is that if the company accepts the application, the student is forced to go (EPFL puts his reputation at stake, its serious blabla).
I really wanted to go in Asia. I tried two courses. The first at Microsoft Research India. They contacted me a month after telling me that because of the crisis World, they did not take a trainee. I also tried
Microsoft Research China, which proposed an internship where the student proposes a topic (the course description was written in incomprehensible English Chinese). So I offered to work in the telecommunication between individuals (VOIP, video conferencing etc..) But rather they sought people in signal processing ... I do not want to do!
Eventually I'll go quietly in the laboratory MICA Vietnam.
My master project will last six months (September 14, 2009 to March 12, 2010). I asked for two small grants of 700 francs each at EPFL for departure. I
do validate my internship in France and Switzerland and I'll pass defenses in the two universities.
Anyway ... I sum up my semester in a nutshell: EPFL is awesome!
I am 6 months during most of my colleagues in France, but I never regret my choice.
remmerci I very very very chalereux Yann Labussiere helped me to organize my year at the EPFL and for his advice. He advised me to do the Masters, he was right!
(I note that according to the classification of Shanghai University of Engineering and Computer Science, EPFL is the 18th largest in the world, 2nd in Europe behind Cambridge (15th) http://ed.sjtu.edu.cn/ARWU-FIELD2008/ENG2008.htm).
I do not even speak of meetings that I have done, people around the world, friends from united states, Macedonia, Spain, Bulgaria etc.. But it's a good experience abroad, I think people went to Sweden at KTH have had the same kind of experience.
Ah done ... if you have a choice between going 6 months or 1 year in Erasmus, please, stay as long as possible. It takes 6 months to know the environment, get used and just start enjoying;).
Thursday, April 30, 2009
Wednesday, April 29, 2009
Male Waxing Ejaculated
FOR SALE
Nice and pleasant house on 3 levels completely renovated located in the heart of the old village of Messery (F-74140), along the Léman lake, at about 5 minutes from Yvoire, 20 minutes from Geneva and Thonon-les-Bains, 40 minutes from Morzine/Avoriaz (french Alpes).
This house is composed of :
- Ground floor :
o 1 independant studio (separated entrance) and its bathroom
o 1 spacious entrance with closet
o 1 playroom with TV / living room
o 1 laundry
- 1st floor :
o 1 dining room / open kitchen on the old village square
o 1 large bedroom with bed for 2 persons
o 1 WC
o 1 bathroom with bath
- 2nd floor :
o 2 large bedrooms (1 with bed for 2 adults, 1 with bed for a baby)
o 1 place with desk (computer) / playground for children
o 1 roof garden (wooden ground) with lake view
o 1 bathroom with shower
Very calm, absolutely no noise.
All conveniences nearby : doctor, and shops (poste, drugstore, baker, hairdressing, supermarket, tearoom, coffee house, pizzeria, garage…)
Very easy to find a parkplace near the house.
Contact:
- Tel: + 33 (0) 4.50.85.11.49
- Email: gismo2369@gmail.com
Monday, March 30, 2009
How To Do A Cellebrite Update
- DRC:
No. 1 studio (separate entrance) and bathroom with shower o
a large entrance with cupboards
o 1 games room / TV lounge
- 1 : o
1 dining room / kitchen in a row overlooking the old town square
o 1 room with fireplace (possibility of making a living)
o o 1 WC 1 bathroom with bath
- 2nd:
o o 1 2 chambers
corner office / play area for children
o 1 terrace (wooden slats) with lake view
o 1 bathroom with shower
Offers all the advantages of a home without the inconvenience of the garden!
Village with all amenities, school, doctors and shops (post office, pharmacy, bakery, hairdressers, small casino, tea, coffee, pizza, car garage ...)
Very easy to park in the neighborhood .
Contact:
- Tel: + 33 (0) 4.50.85.11.49
- Email: gismo2369@gmail.com
Tuesday, February 17, 2009
Ways To Protect A Falling Egg
End of first semester and holiday ... Starting the second half.
I did not have and not take the time to write before. The examinations were intense both in the difficulty level at the time needed for revisions.
Summary of previous episodes:
Party at EPFL in Switzerland in September to do a double degree in computer science, I spent the first half pretty violent with all my classes in English (until then it will) given by Teachers leaving the larger schools (Stanford, MIT, Yale, ETH ...). The level in math is high, especially in the compulsory courses.
I had 14-week course is short when you think, but very dense. Classes ended in late December. The two weeks of Christmas holidays and the first week of January is reserved for revisions. Follow three weeks of exams (final exam).
is long, especially when we only have 5 subjects to go, my 6th review that took place in late December. The hardest I think is that it moves the part it has been over a month since you've finished the course. Not easy to get back into the bath.
Once the partial finished, it follows two weeks of vacation (yes ehhh .... Again ...). I think this is the first time in my life that I preferred to return to school to finish earlier this summer, saying that it has been 2 months since I'm on vacation.
I took this time to go skiing 4 days with fifty students, spend a weekend in Grenoble and advance my semester project, a project of 12 credits asking about 350h of work I created in the Virtual Reality Laboratory at the EPFL.
At the end of the first week of vacation that my grades dropped. I was very scared not to validate and Information Theory Coding, but finally it happened. The notes are available online, a PDF is automatically generated. I validated all of my courses, 15 credits of required courses, courses the most boring and hard (over 15 required) and 16 credits of options (27). It remains for me to finish my project of Humanities and Social Sciences which is the whole year (6 credits total), my semester project (12 credits) and 11 credits of courses varied. I will remain once all this validated my master project (Final Project Study in France).
past my notes I made to my home school (INP Grenoble ESISAR) order to validate my semester in France.
Yesterday, Monday, Feb. 16, classes resumed at the EPFL.
My schedule is much more relaxed than in the first semester and the courses I take are all very interesting. I am not yet sure of the materials that I choose, but it looks like this:
Monday from 8 am to 13h: Business Plan (3 credits) for IT services and Virtual Reality (4 credits)
Possibly Tuesday from 9am to 12pm: Early detection of Technological Innovation potential (4 credits)
Wednesday from 9 am to 12 pm: High-tech Marketing (4 credits)
Possibly Wednesday evening one week of 2 from 16h to 19h: Entrepreneurship and Emerging Economies (2 credits)
Thursday from 16h to 19h: Entrepreneurship (4 credits)
courses that I put in eventually, it depends on my mood, my time of filling that I have with the teacher etc.. I do not need these credits, it's only for my culture if the courses are interesting. I am at least 15 credits for my back (and more material), so 4 courses in total.
The second half will be much more interesting than the first. My schedule is free, although I must spend much time in my lab for the project semester. I have a lot more time to go out and travel.
Enjoy!