And here is the result after 3 months of work
Monday, December 7, 2009
Tuesday, November 24, 2009
Longest Number Ever Recorded
Eve 2010 House St Ismier
2010 will be the year for me back in Grenoble ... For now I do not really know when or for what to do but taste of the installation, Marie and I will arrange a family in St Ismier Eve, as a housewarming party with them.
The information is available at: http://2010reveillon.blogspot.com
2010 will be the year for me back in Grenoble ... For now I do not really know when or for what to do but taste of the installation, Marie and I will arrange a family in St Ismier Eve, as a housewarming party with them.
The information is available at: http://2010reveillon.blogspot.com
Thursday, October 22, 2009
Gay Cruising Spots Lubbock,tx
Sunday, October 18, 2009
Oem Oil Filter For Is300
Works II Works
Having taken a little better 3DVIA Shape tool in hand, I could remake the model of the house more closely. Better able to realize the changes, I first tried to make a model of the existing house
The decor / furniture is made briefly, just to give a scale and apreçu functions of the parts. The first floor and the attic is not too messed up, I gave them to appear on the model easier to navigate.
The current proposal is basically the architect to meet the 3 pieces of life into a single space performing the functions of kitchen / living room / lounge. The laundry area is optimized and the old fireplace in the lounge ordered destroyed to create storage space in the kitchen and laundry. Outside, the gate is closed: a new opening in the wall is made across the field. The cars are parked now taken on a square on the area of front garden. The current location of car traffic is thus freed to create a new living space (Oven Pizza: D)
For the moment nothing is fixed, all this may well sure change, especially when the first budget estimates will be made: (
Having taken a little better 3DVIA Shape tool in hand, I could remake the model of the house more closely. Better able to realize the changes, I first tried to make a model of the existing house
The decor / furniture is made briefly, just to give a scale and apreçu functions of the parts. The first floor and the attic is not too messed up, I gave them to appear on the model easier to navigate.
The current proposal is basically the architect to meet the 3 pieces of life into a single space performing the functions of kitchen / living room / lounge. The laundry area is optimized and the old fireplace in the lounge ordered destroyed to create storage space in the kitchen and laundry. Outside, the gate is closed: a new opening in the wall is made across the field. The cars are parked now taken on a square on the area of front garden. The current location of car traffic is thus freed to create a new living space (Oven Pizza: D)
For the moment nothing is fixed, all this may well sure change, especially when the first budget estimates will be made: (
Subscribe to:
Posts (Atom)